Accountancy Forum
  • Accountancy
  • Forum Home
  • Members
  • Team
  • Help
  • Search
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Accountancy Forum The Profession Accounting and Audit v
« Previous 1 … 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 … 28 Next »
Flexible Budgets and Overhead Analysis

 
  • 0 Vote(s) - 0 Average
Flexible Budgets and Overhead Analysis
shahid amin
Offline

Member

Posts: 55
Threads: 9
Joined: Aug 2009
Reputation: 0
#1
08-27-2009, 08:44 PM
<font color="blue"><b>Budget Variance</b></font id="blue">

A measure of the difference between the actual fixed overhead costs incurred during the period and budgeted fixed overhead costs as contained in the flexible budget.

<font color="blue"><b>Denominator Activity</b></font id="blue">

The activity figure used to compute the predetermined overhead rate.

<font color="blue"><b>Flexible Budget</b></font id="blue">

A budget that is designed to cover a range of activity and that can be used to develop budgeted costs at any point within that range to compare actual costs incurred.

<font color="blue"><b>Static Budget</b></font id="blue">

A budget created at the beginning of the budgeting period that is valid only for the planned level of activity.




<font color="blue"><b>Volume Variance</b></font id="blue">

The variance that arises whenever the standard hours allowed for the output of a period are different from the denominator activity level that was used to compute the predetermined overhead rate.
awaisaftab
Offline

Posting Freak

Posts: 961
Threads: 80
Joined: Jan 2009
Reputation: 0
#2
08-28-2009, 03:37 PM
What is the difference betweeen fixed and flexible budget?
shahid amin
Offline

Member

Posts: 55
Threads: 9
Joined: Aug 2009
Reputation: 0
#3
08-28-2009, 05:39 PM
<blockquote id="quote"><font size="1" face="Verdana, Arial, Helvetica, san" id="quote">quote<hr height="1" noshade id="quote"><i>Originally posted by awaisaftab</i>
<br />What is the difference betweeen fixed and flexible budget?
<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
Dear sir,
According to my point of view the difference between fixed and flexible budget is as follows
<b>The fixed budget</b> is prepared based only on one level of output.
<b>A flexible budget</b> is a budget which is designed to change in accordance with the level of activity or relevant range attained.
Fixed cannot be changed after the period begins, whereas a flexible budget can be changed after the period begins
Fixed is a plan for a single level of production, whereas a flexible budget is several plans (one for each of several production levels).

Fixed includes only fixed costs, whereas a flexible budget includes only variable costs.

Please help me sir if I am wrong.
shahid amin
Offline

Member

Posts: 55
Threads: 9
Joined: Aug 2009
Reputation: 0
#4
08-31-2009, 04:42 PM
<blockquote id="quote"><font size="1" face="Verdana, Arial, Helvetica, san" id="quote">quote<hr height="1" noshade id="quote"><i>Originally posted by shahid amin</i>
<br /><blockquote id="quote"><font size="1" face="Verdana, Arial, Helvetica, san" id="quote">quote<hr height="1" noshade id="quote"><i>Originally posted by awaisaftab</i>
<br />What is the difference betweeen fixed and flexible budget?
<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
Dear sir,
According to my point of view the difference between fixed and flexible budget is as follows
<b>The fixed budget</b> is prepared based only on one level of output.
<b>A flexible budget</b> is a budget which is designed to change in accordance with the level of activity or relevant range attained.
Fixed cannot be changed after the period begins, whereas a flexible budget can be changed after the period begins
Fixed is a plan for a single level of production, whereas a flexible budget is several plans (one for each of several production levels).

Fixed includes only fixed costs, whereas a flexible budget includes only variable costs.

Please help me sir if I am wrong.

<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
Dear sir I m waiting for your reply!
awaisaftab
Offline

Posting Freak

Posts: 961
Threads: 80
Joined: Jan 2009
Reputation: 0
#5
08-31-2009, 05:04 PM
I think I was not taking your test. But your reply is correct.

But the following line in wrong

"Fixed includes only fixed costs, whereas a flexible budget includes only variable costs"

Both flexible and fixed budgets contain on budgeted fixed and budgeted variable costs.

Keep it up

Regards,

Awais Aftab
shahid amin
Offline

Member

Posts: 55
Threads: 9
Joined: Aug 2009
Reputation: 0
#6
09-01-2009, 05:50 PM
Thanks sir!
Ok, i will try my best to clear wrong concept,

please guide me further, about study as well as about my carrer.
tariq aziz
Offline

Junior Member

Posts: 11
Threads: 0
Joined: Sep 2009
Reputation: 0
#7
09-03-2009, 05:01 PM
nice effor Mr.shahid...some more explanation is needed on this topic..
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



  • View a Printable Version
  • Subscribe to this thread
Forum Jump:

© 2002-2024 Accountancy. Copyrights of all content on this web site are owned by Accountancy except where indicated in source or copyright statements. Accountancy must be contacted for permission to copy or redistribute any material published on this website.

Linear Mode
Threaded Mode