Accountancy Forum
  • Accountancy
  • Forum Home
  • Members
  • Team
  • Help
  • Search
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Accountancy Forum The Profession Accounting and Audit v
« Previous 1 … 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 … 28 Next »
Flexible Budgets and Overhead Analysis

 
  • 0 Vote(s) - 0 Average
Flexible Budgets and Overhead Analysis
shahid amin
Offline

Member

Posts: 55
Threads: 9
Joined: Aug 2009
Reputation: 0
#4
08-31-2009, 04:42 PM
<blockquote id="quote"><font size="1" face="Verdana, Arial, Helvetica, san" id="quote">quote<hr height="1" noshade id="quote"><i>Originally posted by shahid amin</i>
<br /><blockquote id="quote"><font size="1" face="Verdana, Arial, Helvetica, san" id="quote">quote<hr height="1" noshade id="quote"><i>Originally posted by awaisaftab</i>
<br />What is the difference betweeen fixed and flexible budget?
<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
Dear sir,
According to my point of view the difference between fixed and flexible budget is as follows
<b>The fixed budget</b> is prepared based only on one level of output.
<b>A flexible budget</b> is a budget which is designed to change in accordance with the level of activity or relevant range attained.
Fixed cannot be changed after the period begins, whereas a flexible budget can be changed after the period begins
Fixed is a plan for a single level of production, whereas a flexible budget is several plans (one for each of several production levels).

Fixed includes only fixed costs, whereas a flexible budget includes only variable costs.

Please help me sir if I am wrong.

<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
Dear sir I m waiting for your reply!
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Messages In This Thread
Flexible Budgets and Overhead Analysis - by shahid amin - 08-27-2009, 08:44 PM
[No subject] - by awaisaftab - 08-28-2009, 03:37 PM
[No subject] - by shahid amin - 08-28-2009, 05:39 PM
[No subject] - by shahid amin - 08-31-2009, 04:42 PM
[No subject] - by awaisaftab - 08-31-2009, 05:04 PM
[No subject] - by shahid amin - 09-01-2009, 05:50 PM
[No subject] - by tariq aziz - 09-03-2009, 05:01 PM

  • View a Printable Version
  • Subscribe to this thread
Forum Jump:

© 2002-2024 Accountancy. Copyrights of all content on this web site are owned by Accountancy except where indicated in source or copyright statements. Accountancy must be contacted for permission to copy or redistribute any material published on this website.

Linear Mode
Threaded Mode